Value Engineering
C3MG is a recognized leader in value engineering and related services.
We provide comprehensive services, including predesign workshops, value
engineering studies, and constructability reviews on various types of
projects at all phases of planning and design. We work closely with the
owner and design team to explore innovative, cost-conscious alternatives
and solutions to obtain the maximum value for each dollar. In addition
to cost savings and design/constructability issues, we explore areas for
risk avoidance and claims prevention. Each study is developed in
accordance with the five-step job plan established by the Society of
American Value Engineers International (SAVE).
Five Step Job Plan
Information Phase
Creative Phase
Analysis Phase
Development Phase
Presentation Phase
Our experience on value engineering studies includes projects throughout
the United States and includes all types of projects. This includes
schools, community colleges, universities, We assemble an independent
team of professional architects and engineers to execute specific tasks
with specialists available in required areas. We maintain a network of
professionals throughout the United States which includes experts in
every discipline, and all geographic locations. Our staff includes
value engineering experts who can lead and/or participate as team
members fully dedicated to providing quality value engineering services.
Our unique and innovative approach provides clients with the
flexibility to focus on a variety of project issues and meet budget
constraints. The return on investment (ROI) of a typical study is in
excess of 15:1.
C3MG workshops are conducted in accordance with the methodology
established by SAVE. Our continued education in value engineering and
related services keeps our staff at the forefront for current trends and
extensive cost control information and systems to focus our efforts
targeting high and low areas of cost. We provide cost estimate reviews
and analysis to generate very powerful and useful cost information for
all disciplines. This includes cost models, cost comparison reports,
life cycle costs, building systems breakdown, and other cost reports and
graphics to answer all questions regarding cost. In addition, we
maintain on-line with our cost database during studies to quickly and
easily provide cost information throughout the workshop.
Studies are tailored to meet the specific goals and objectives set forth
by the owner and design team. Typical C3MG studies consist of the
five-step job plan as follows:
THE PROCESS!
C3MG has developed a unique and innovative approach that is proven and
highly effective to organizing and developing VE studies and
constructability reviews. Although every project is different and has
its unique elements, each C3MG workshop follows this basic pattern of
events with additional elements integrated throughout to meet specific
goals and objectives.
Prestudy Preparation
To effectively utilize all the time available for a successful VE study,
the preparation of materials and agenda needs to occur prior to the
actual VE workshop. C3MG's prestudy preparation for the VE study
includes meeting with the owner and design team, scheduling of select
consultants with specific tasks, videotaped site visits (if possible),
gathering project information and understanding the goals and objectives
of the project. We compile this information in a variety of formats and
graphics for use during the workshop. C3MG, a specialist in project
cost control, will provide cost estimate reviews or independent cost
estimates, develop cost models, cost comparison reports, life cycle
costs, and preliminary construction schedules as additional resources
for the team. We analyze operations and maintenance costs, equipment,
materials, crew rates, and most cost-effective construction delivery
methods.
Develop Cost Model
C3MG is a firm which specializes in providing detailed and accurate cost
information. Our nationally certified cost engineers combined with
state-of-the-art computer technology has enabled our firm to generate
extremely powerful and useful cost information to allow owners and the
design team to make proactive design management decisions. The primary
tool is a detailed cost model. C3MG will develop a cost model of
project costs breaking down the project into systems for narrower cost
ranges and more usable information. This information is crucial to
targeting both high and low areas of costs to determine optimum areas
for opportunity.
Select Team
Based on the information gathered and preliminary meetings with the
owner and design team, specific issues and concerns can be identified
with specific team members selected to address these topics. This
enables C3MG to select a team with very specific tasks to maximize the
time and budget available. Choosing the right team is critical to the
success of any study and must include an experienced team leader, an
experienced team based on a thorough understanding of the owner's goals
and objectives, and must be able to work closely and effectively with
the design team. This provides as the catalyst for a dynamic team and
successful workshop.
Other team members may be selected after further review of the project
goals and objectives and preliminary meetings with the owner and design
team. This team will include technically sound and experienced experts
in specific disciplines covering all necessary areas of a project. The
number of participants will be determined from the types of expertise
required and level of owner/user staff participation. Input from the
owner and design team will be encouraged to help determine the team
structure. This may include specialists in civil, structural,
mechanical, electrical, architectural, landscape, geotechnical, etc..
In addition, members from the owner's staff who are intimately familiar
with the operations and maintenance or programming issues for the
proposed project may be involved. This team will have the ability to
work closely and effectively with the project design team to clearly
express ideas and their overall impacts to the project. Working
productively with the owner and design team is crucial to the success of
any workshop.
Project Presentations/Questions and Answers
C3MG will request that the owner and design team present the project to
date. This will include the original project goals and objectives,
current status, programming, level of design completion, areas of
concern, etc. This will provide the opportunity to clarify project
issues, answer questions, and provide a forum to identify various
project functions.
Site Tour
After the project presentation, a site tour may occur to further discuss
project issues, understand current site and building conditions, and
provide an opportunity to begin to explore alternatives.
Define Goals
Definition of project and workshop goals is based upon the owner and
design team's goals and objectives.
Team Building
The team will begin discussing the project, share insights and concerns,
and begin the process of furthering a creative and innovative team.
This is also an opportunity for the team leader to focus the team's
energies and adhere to workshop parameters.
Functional Analysis/Project Review
The C3MG team will further review the project based on the information
gathered and experience with the project to date. This will include
current program and design documents, specifications, technical reports,
preliminary costs, etc. Our team will begin functional analysis to
completely understand the program and desired functions of the facility,
as well as look at constructability issues. We develop Functional
Analysis Systems Technology (FAST) diagrams as a tool to help answer
questions. Our team will continue to focus this effort throughout the
process to explore value-added design alternatives and/or cost-effective
solutions. In addition, we explore areas for potential claims or risk
associated with the design and construction.
Cost Model Focus
C3MG will utilize the project cost model and C3MG historical cost data
to target areas within the project that require further investigation.
The cost model will target high and low cost areas - areas of greatest
opportunity. C3MG will also review similar projects as a form of
quality assurance and develop cost comparison reports.
Creative Brainstorming
The C3MG team will spend more time together to creatively brainstorm
various ideas for cost-effective and innovative design solutions. The
team records all possible ideas of providing the necessary functions
within the project at a reduced cost to the owner, or with an
improvement to the quality throughout the life of the facility (life
cycle costs). Throughout this brainstorming phase, every idea will be
considered without judgment. The team will embark upon hundreds of
ideas to explore every possible scenario and any association of ideas to
further expand the possibilities. These items are reviewed again at a
later phase for validity.
Judgment/Ranking
C3MG will prioritize and rank each idea from the creative brainstorming
session to determine which ideas have the greatest impacts on cost,
schedule and design, considering both advantages and disadvantages for
value-added solutions.
Develop Preliminary Selection of Suggestions
The C3MG team will develop a preliminary list of suggestions. These
suggestions will be ranked and prioritized for presentation.
Present Preliminary Selection of Suggestions
C3MG will present the preliminary list of selected ideas, along with a
complete list of all the ideas, to be reviewed and considered by the
owner and design team. This will provide an opportunity to clarify any
issues and provide another opportunity to further learn and discuss the
project. Also, this will provide another opportunity to further
incorporate ideas that were not chosen in the preliminary selection,
discard ideas that may not be of interest to the owner, and confirm the
preliminary list of suggested ideas.
Idea Development/Report Preparation
C3MG completely develops each selected idea incorporating all
descriptions, costs, sketches, and overall project impacts. Each
selected idea describes the original concept, proposed recommendation
(change), a brief discussion of project impacts (pros and cons),
detailed cost estimate of original vs. proposed changes, life cycle
costs, O&M costs, and potential cost savings with sketches, if
necessary, to clearly illustrate the design concepts. This is drafted
during the actual study by a project coordinator to expedite the report
development process. This also enables our team to continue
brainstorming to maximize their time available and does not waste time
and resources of professionals performing clerical functions.
Post Study
The post study is unique due to the expeditious format and approach
employed by C3MG into each study. No further need to review ideas,
respond to comments or suggestions from the owner and design team is
necessary because this has been promoted throughout the development of
the study. The post study is a quality assurance program for C3MG
providing an opportunity for feedback from the owner and design team.
recorded for future reference. This unique and innovative approach
enables C3MG to further evaluate and continue evolving the process.